Skip to content
Al-Nooriya Junior School
School Infrastructure · 2025

Al-Nooriya Junior School Classroom ExpansionKuchchaveli Academic Block

Construction of additional reinforced classrooms to expand daily educational capacity and address overcrowding for middle-school pupils in Kuchchaveli.

Client / Sector

Barakah Charity & Zonal Education Office

Location

Kuchchaveli, Trincomalee District

Timeline

2025

Scope

2-Classroom Building · Structural Expansion

Project Overview

Expanding capacity for junior scholars.

Junior students at Al-Nooriya were previously constrained by limited facilities. Barakah Charity initiated this structural addition to provide dedicated classrooms tailored for older junior school curricula.

The building features durable masonry, reinforced corner columns, and wide corridor verandas providing space for rainy-day study and break intervals.

110+Junior Students
2Finished Classrooms
100%Reinforced Structure
Al-Nooriya Junior School
Junior Academic Wing
Structural Framework and Classroom Wing Exterior

Structural Framework and Classroom Wing Exterior

01 / 03
2 RoomsCLASSROOM SPACES

Spacious dual hall layout

110+JUNIOR SCHOLARS

Daily secondary prep learning

May 2025FOUNDATION DATE

Commenced on official schedule

100%MASONRY INTEGRITY

Engineered for high coastal weather resistance

Scope execution
Certified Construction Audit
Scope of Work

Reliable construction for safe schooling.

Reinforced concrete strip footings with anti-moisture damp proof course
Heavy brick wall envelope with exterior weather-resistant rendering
Two standard curriculum classrooms with ample natural light
Steel-framed roof truss system with thermal insulation
Dual door egress designed to municipal school safety standards
Comprehensive surface water drainage channel around perimeter
Project MilestoneFoundation 9 May 2025 · Structural Works Completed
Architectural Study

Spatial textures and civic presence.

Visual records detailing structural joinery, concrete curing, and thermal circulation pathways.

Completed Classroom Elevation
Completed Classroom Elevation
Classroom Interior with Blackboards
Classroom Interior with Blackboards
Side Elevation & Veranda Access
Side Elevation & Veranda Access
Our Process

Blueprint to Reality.

From soil borehole test reports to final municipal certificate handovers, every stage is audited by independent civil engineers.

01

Enrollment Analysis

Determining pupil intake growth to size classrooms appropriately.

02

Foundation Construction

Laying foundation trenches and casting ground beams on 9 May 2025.

03

Superstructure Build

Erecting structural columns and wall masonry.

04

Roofing & Painting

Installing heavy roof trusses and protective paint finishes.

Architectural perspective left
Architectural perspective right
“
“Every brick laid represents a safer and more promising tomorrow for our village children.”
— M. T. Faleel · Faculty Representative · Al-Nooriya Junior School
Project Gallery

Documented perspectives.

Front Exterior View
Exteriors
Interior Classroom Space
Interiors
Roofing & Truss Joinery
Details
Credits

Team & Collaborators.

Executed with transparent contractor agreements, accredited engineering oversight, and community steering committees.

Project SponsorBarakah Charity Sri Lanka Donors
Zonal OversightKuchchaveli Zonal Education Office
Accreditations:Kuchchaveli Community Development Recognition
Al-Furqan Vidyalayam
Next Project

Al-Furqan Vidyalayam School Building

China Bay, Trincomalee · 2025

View Project
Fund an Initiative

Commission a school, well, or dialysis unit in your name.

Every project includes engraved dedication plaques, comprehensive financial accounting, and certified drone video verification upon completion.