Skip to content
Al-Askar Vidyalayam
School Infrastructure · 2025

Al-Askar Vidyalayam New Learning WingKinniya Educational Block

A brand-new 2-classroom school building providing improved learning facilities and classroom furniture for students in Kinniya.

Client / Sector

Barakah Charity Sri Lanka & Zonal Education Office

Location

Kinniya, Trincomalee District

Timeline

2025

Scope

2-Classroom School Building · Furniture Fit-out

Project Overview

Relieving critical crowding in Kinniya schools.

With high student density in Kinniya, Al-Askar Vidyalayam urgently needed additional dedicated classroom spaces. Barakah Charity funded and constructed a bright, airy dual-classroom facility.

Engineered with high ceilings and wide louvered windows, the building maximizes passive sea breeze ventilation while protecting against harsh coastal sun.

150+Children Impacted
2Modern Classrooms
100%Operational & Furnished
Al-Askar Vidyalayam
Primary & Junior Wing
Handover Day Gathering with Village Elders and Students

Handover Day Gathering with Village Elders and Students

01 / 03
2 ClassroomsNEW SPACES

Spacious layout with high thermal comfort

150+BENEFICIARIES

Enrolled school children every day

112 DaysBUILD SPEED

Swift execution without educational disruption

80 SetsDESKS & BENCHES

Handcrafted durable local woodwork

Scope execution
Certified Construction Audit
Scope of Work

Quality architecture built for young minds.

Anti-saline concrete foundation tailored to Kinniya coastal soils
Steel-reinforced brick structural columns and tie lintels
Two standard curriculum classrooms with ample circulation
Complete set of dual student desks and teachers' chairs
Natural cross-ventilation system with passive louvres
External concrete apron to protect against monsoon splashes
White reflective roof coatings to minimize solar heat gain
Signed off by Department of Education structural inspectors
Project MilestoneFoundation 26 Sept 2024 · Opened 17 Jan 2025
Architectural Study

Spatial textures and civic presence.

Visual records detailing structural joinery, concrete curing, and thermal circulation pathways.

Completed Facade with Shaded Veranda Entry
Completed Facade with Shaded Veranda Entry
Bright Classroom Interior with Furnishings
Bright Classroom Interior with Furnishings
Opening Day Ceremonial Community Assembly
Opening Day Ceremonial Community Assembly
Our Process

Blueprint to Reality.

From soil borehole test reports to final municipal certificate handovers, every stage is audited by independent civil engineers.

01

Campus Space Survey

Selecting the optimal elevated campus location to prevent monsoon puddling.

02

Foundation Engineering

Excavation and casting of corrosion-resistant concrete foundation piers.

03

Masonry Superstructure

Bricklaying, lintel pouring, and roof truss erection.

04

Finishes & Furnishing

Plastering, painting, electrical conduit rough-ins, and furniture delivery.

05

Inauguration Ceremony

Opened on 17 January 2025 with students, teachers, and donor representatives.

Architectural perspective left
Architectural perspective right
“
“A clean, bright classroom changes how a child feels about learning. This gift from Barakah has lifted the morale of our whole school.”
— A. S. Mohamed · Headmaster · Al-Askar Vidyalayam, Kinniya
Project Gallery

Documented perspectives.

Main Classroom Building
Exteriors
Interior Classroom Setup
Interiors
Handover Celebration
Community
Credits

Team & Collaborators.

Executed with transparent contractor agreements, accredited engineering oversight, and community steering committees.

Funding SponsorBarakah Charity Sri Lanka Donors
Civil EngineeringKinniya Municipal Engineering Works
Construction TeamKinniya Masonry Works Collective
Accreditations:Kinniya Zonal Civic Award 2025
Al-Nooriya Junior School
Next Project

Al-Nooriya Junior School Classroom Expansion

Kuchchaveli, Trincomalee · 2025

View Project
Fund an Initiative

Commission a school, well, or dialysis unit in your name.

Every project includes engraved dedication plaques, comprehensive financial accounting, and certified drone video verification upon completion.